HIMACHAL PRADESH STATE
ELECTRICITY BOARD
Click Here to
Download complete
information under section
4 (1) (b) of RTI ACT, 2005
i)
and new addition to the organization and all policy matters,
affecting service conditions and benefits requiring Board’s approval.
ii)
The Member will devise a reporting system by which the Board is kept
apprised periodically of the financial results of the Boards working, review
of actual against Budget, results of internal audit and any other matters of
importance and interest which in his opinion needs to be brought to the
notice of the Board.
2.3 Member
(Tech):
i)
Member will be responsible for efficient maintenance of existing
generating stations.
ii)
He should take measure to reduce the line losses to the minimum
consistent with actual operation and to minimize the interruption of supply
and fluctuations of voltage and for removal of other defects.
iii)
Member will be generally responsible for planning of Generation to
meet existing and envisaged future and unfailing supply of power all over
the state, and in accordance with the Board’ policy for interlinking the
Board’s systems with those other Boards/Utility and state.
iv)
He should take measure in preparation of electrical
chapters of new & future hydro‑electric power projects,
v)
Member will be responsible for long terms planning of
transmission & Sub-transmission system in Himachal Pradesh, preparation of
schemes for rural electrification, system improvement and for requirement of
capacitors in various sub‑stations.
vi)
Member will be responsible for State Load Despatch
Centre(SLDC) and interstate export & import of power.
vii)
Member will be responsible to prepare MOUs & power
purchase agreements with IPPs apart from framing of policies for
Private/Central Sector.
viii)
Suitable advice on all matters coming within the purview of his
functions to the Board.
2.4 Member
(Operation)
i)
Deals with the Operation Maintenance of the distribution system of
the Board divided in 3 units viz South Zone, North Zone and Central Zone. |