HIMACHAL PRADESH STATE
ELECTRICITY BOARD
Click Here to Download
complete
information under section
4 (1) (b) of RTI ACT, 2005
1.7.4.1 CHIEF ENGINEER (PROJECTS) SHIMLA:
Execution of civil works for Bhaba Augmentation Hydro
Project, Khauli Hydro Project and some other investigation works in Satluj
Basin have been entrusted to this Chief Engineer.
1.7.4.2 CHIEF ENGINEER (DESIGNS) SUNDERNAGAR:
Design & preparation of const. drawings & technical
specifications of civil/mechanical components of the ongoing projects like
Kashang, Bhaba Aug., Ganvi-II, Uhl Stage-III, Khauli, Thirot, Larji and
detailed engineering of new schemes has been entrusted to this Chief
Engineer. Central soil and concrete research lab attached with this wing
carries out all kinds of tests on construction material and concrete for
various projects under construction/investigation. Meteorological data,
rainfall, discharge and silt data etc. is also maintained in this wing.
1.7.4.3 CHIEF ENGINEER (LARJI HYDEL PROJECT) BHUNTER:
Planning and construction of Larji Hydel Project has
been entrusted to this Chief Engineer.
1.7.4.4 CHIEF ENGINEER (I&P) SUNDERNAGAR:
This unit has been assigned the works for execution of Holi
Hydel Project, Survey & Investigation, formulation of PFRs and DPRs of
hydroelectric schemes in Ravi, Beas, Chenab & Yamuna basins and obtaining
the techno-economic & MOEF clearances from Govt. of India.
1.7.4.5 SYSTEM OPERATION:
This Wing headed by Chief Engineer (System Operation) has been
assigned the duties of State Load Despatch Centre(SLDC), interstate
export and import of power, matter relating to CERC and settlement of civil
works disputes arising between HPSEB and other parties, through arbitration.
The main responsibilities of HPSLDC are:
i)
Monitoring of system parameters and security.
ii)
To ensure the integrated operation of the power system of
HPSEB with Northern Load Dispatch Center.
iii)
System studies, planning and contingency analysis.
iv)
Analysis of tripping/disturbances and facilitating
immediate remedial measures.
v)
Daily scheduling and operational planning.
vi)
Facilitating bilateral exchanges.
vii)
Computation of energy dispatch and drawal values using
SEMs.
1.7.4.6 SYSTEM PLANNING WING:
System Planning Wing headed by Chief Engineer (Electrical) is
entrusted with the long terms planning of transmission & Sub-transmission
system in Himachal Pradesh, preparation of electrical chapters of new &
future hydro‑electric power projects, preparation of schemes for rural
electrification, system improvement and for requirement of capacitors in
various sub‑stations. Revision of transmission schemes is also undertaken by
this wing. The Chief Engineer (System Planning) is the Nodal Officer in
respect of schemes of electrical works being funded by M/s PFC Ltd. APDRP
schemes of Ministry of Power, Govt. of India and Ministry of
Non-Conventional Energy Sources, New Delhi. He is also the signatory of all
the loan documents relating to PFC Financed Electrical schemes, besides
forwarding the payments and reimbursement claims pertaining to these
schemes. |