HIMACHAL PRADESH STATE ELECTRICITY BOARD

 

Click Here to Download complete information under section 4 (1) (b) of  RTI ACT, 2005

  

1.7.4.1    CHIEF ENGINEER (PROJECTS) SHIMLA:

                    Execution of civil works for Bhaba Augmentation Hydro Project, Khauli Hydro Project and some other investigation works in Satluj Basin have been entrusted to this Chief Engineer.

1.7.4.2    CHIEF ENGINEER (DESIGNS) SUNDERNAGAR:

            Design & preparation of const. drawings & technical specifications of civil/mechanical components of the ongoing projects like Kashang, Bhaba Aug., Ganvi-II, Uhl Stage-III, Khauli, Thirot, Larji and detailed engineering of new schemes has been entrusted to this Chief Engineer.  Central soil and concrete research lab attached with this wing carries out all kinds of tests on construction material and concrete for various projects under construction/investigation.  Meteorological data, rainfall, discharge and silt data etc. is also maintained in this wing.

1.7.4.3 CHIEF ENGINEER (LARJI HYDEL PROJECT) BHUNTER:

                    Planning and construction of Larji Hydel Project has been entrusted to this Chief Engineer.

1.7.4.4    CHIEF ENGINEER (I&P) SUNDERNAGAR:

            This unit has been assigned the works for execution of Holi Hydel Project, Survey & Investigation, formulation of PFRs and DPRs of hydroelectric schemes in Ravi, Beas, Chenab & Yamuna basins and obtaining the techno-economic & MOEF clearances from Govt. of India.

1.7.4.5                 SYSTEM OPERATION:

            This Wing headed by Chief Engineer (System Operation) has been assigned the duties of         State Load Despatch Centre(SLDC), interstate export and import of power, matter relating to CERC and settlement of civil works disputes arising between HPSEB and other parties, through arbitration.

The main responsibilities of HPSLDC are:

i)                    Monitoring of system parameters and security.

ii)                   To ensure the integrated operation of the power system of HPSEB with Northern Load Dispatch Center.

iii)                 System studies, planning and contingency analysis.

iv)                 Analysis of tripping/disturbances and facilitating immediate remedial measures.

v)                  Daily scheduling and operational planning.

vi)                 Facilitating bilateral exchanges.

vii)               Computation of energy dispatch and drawal values using SEMs.

1.7.4.6                 SYSTEM PLANNING WING:

            System Planning Wing headed by Chief Engineer (Electrical) is entrusted with the long terms planning of transmission & Sub-transmission system in Himachal Pradesh, preparation of electrical chapters of new & future hydro‑electric power projects, preparation of schemes for rural electrification, system improvement and for requirement of capacitors in various sub‑stations. Revision of transmission schemes is also undertaken by this wing. The Chief Engineer (System Planning) is the Nodal Officer in respect of schemes of electrical works being funded by M/s PFC Ltd. APDRP schemes of Ministry of Power, Govt. of India and Ministry of Non-Conventional Energy Sources, New Delhi.  He is also the signatory of all the loan documents relating to PFC Financed Electrical schemes, besides forwarding the payments and reimbursement claims pertaining to these schemes. 

Back Next

Click Here to Download complete information under section 4 (1) (b) of  RTI ACT, 2005